Master your Minecraft
 
 

Special Offers see all

Enter to WIN a $100 Credit

Subscribe to PowellsBooks.news
for a chance to win.
Privacy Policy

Tour our stores


    Recently Viewed clear list


    What I'm Giving | December 1, 2014

    Edward O. Wilson: IMG Edward O. Wilson: What I'm Giving



    At Powell's, we feel the holidays are the perfect time to share our love of books with those close to us. For this special blog series, we reached... Continue »

    spacer
Qualifying orders ship free.
$151.50
New Hardcover
Ships in 1 to 3 days
Add to Wishlist
available for shipping or prepaid pickup only
Available for In-store Pickup
in 7 to 12 days
Qty Store Section
25 Remote Warehouse Construction- Contracting

Evaluating Contract Claims

by

Evaluating Contract Claims Cover

 

Synopses & Reviews

Publisher Comments:

Most medium to large construction contracts include a claim for extra payment for variations or disruption to the programme. Whilst the causes of the claim are often well documented, what can and cannot be included in the payment is often misunderstood and the calculation of quantum consequently becomes vague and poorly substantiated.

Thoroughly updated over the previous edition, reflecting pertinent Court decisions on damages and the duty to mitigate, the new edition covers new provisions of the revised JCT 2005 contracts and the 2005 New Engineering Contract. There is substantial additional material on issues arising from time and delay analysis and the financial consequences of changes to time – issues that regularly cause real problems in the evaluation of quantum for construction claims.

Most current books on the subject concentrate on the establishment of liability and the requirements of individual standard forms of contract. This book, however, concentrates on the quantification of claims after liability has been established, regardless of the form of contract used, and sets out the principles and methods that should be reflected in the evaluation of claim quantum and the standard of substantiation required. It will therefore appeal to those working with both building and engineering contracts.

Reviews of the previous edition

"Well written and highly informative" Building Engineer

“His observations on the assessment of productivity and the use of facilities and equipment are particularly helpful for lawyers, who deal with construction claims” Construction Law

Synopsis:

Most medium to large construction contracts include a claim for extra payment for variations and changes or for disruption to the programme. A number of books address the legal and contractual basis for such claims, but few if any show how such claims should be quantified. This book will provide a detailed guide to evaluating such claims, showing how they are priced and how a valid claim is prepared.

About the Author

Peter Davison BA MSc FRICS FCIArb has spent much of his career as a quantity surveyor working on projects in many parts of the UK, Europe, and the Middle and Far East. He worked for civil and mechanical engineering contractors, client organisations and consultants before founding Davison George and Partners in 1982, now Driver Consult Ltd. A Fellow of the Royal Institution of Chartered Surveyors and the Chartered Institute of Arbitrators, he has also sat as an Arbitrator on major international disputes administered by the International Chamber of Commerce.

John Mullen BSc(Hons) MSc FRICS FInstCES FCIArb MAE began his training with a national firm of contractors, subsequently moving into private practice and has specialised for the last 25 years in providing consultancy services to the building and engineering construction industries. He has enjoyed over 40 appointments as an expert witness in cases at the High Court, International Chamber of Commerce arbitration, and in domestic arbitration.

Table of Contents

1 Introduction.

2 Establishing the base.

3 Effect of change on programmes of work.

4 Sources of financial information for evaluation.

5 Evaluation of the direct consequences of change.

6 Evaluation of the time consequences of change.

7 Other sources of claims.

8 Minimising the consequences of change.

Appendix A: Example of financial accounts.

Appendix B: Example of management accounts.

Table of Cases

Product Details

ISBN:
9781405159203
Author:
Davison, R. Peter
Publisher:
Wiley-Blackwell
Author:
Davison, P.
Author:
Mullen, John
Subject:
Buildings
Subject:
Construction industry
Subject:
Construction - Contracting
Subject:
Civil
Subject:
Engineering - Civil
Subject:
Remedies (law)
Subject:
Construction contracts
Subject:
Construction Law
Copyright:
Edition Description:
WOL online Book (not BRO)
Publication Date:
20090501
Binding:
HARDCOVER
Grade Level:
Professional and scholarly
Language:
English
Illustrations:
Y
Pages:
312
Dimensions:
9.70x7.10x.90 in. 1.80 lbs.

Related Subjects

Engineering » Civil Engineering » General
Engineering » Construction » Contracting

Evaluating Contract Claims New Hardcover
0 stars - 0 reviews
$151.50 In Stock
Product details 312 pages Wiley-Blackwell - English 9781405159203 Reviews:
"Synopsis" by , Most medium to large construction contracts include a claim for extra payment for variations and changes or for disruption to the programme. A number of books address the legal and contractual basis for such claims, but few if any show how such claims should be quantified. This book will provide a detailed guide to evaluating such claims, showing how they are priced and how a valid claim is prepared.
spacer
spacer
  • back to top

FOLLOW US ON...

     
Powell's City of Books is an independent bookstore in Portland, Oregon, that fills a whole city block with more than a million new, used, and out of print books. Shop those shelves — plus literally millions more books, DVDs, and gifts — here at Powells.com.