Excerpt from Works Connected With Ocean and Inland Navigation: Belgium and Holland, Notes on the Works Approved or Completed in 1920
These works, authorised in 1913, form the complement of those executed from 1907 to 1910, in the passage of Ghent by water, in view of making the communications easier between the Upper Scheldt and the port of Ghent, by doing away with two locks. After their completion the Pecherie Canal will have a depth of 0 m. Ft.) and an average width of 35 m.
The drawbridge will have a single span of 18 m. (59 ft.) width with a minimum headroom of m.
The whole of the extension works of the reach, excepting the drawbridge, was adjudicated in July, 1914, at the price of francs, these works were stopped at the beginning of August, 1914, and have not as yet been resumed.
The construction of the drawbridge was the object of a detailed contract and was valued at about francs.
About the Publisher
Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com
This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.