Synopses & Reviews
Synopsis
Excerpt from Annual Report of the Board of Harbor and Land Commissioners: For the Year 1895
The dredging at the mouth of Chelsea Creek, under this contract, has increased the available depth in the creek six feet. There are now eighteen feet over the bar at low water, where there were formerly twelve feet, and this in creased depth can now be carried above the Grand J unction railroad bridge.
The dredging in the Reserved Channel has increased the depth in the out-ofi' channel to twelve feet at mean low water, and the width of the main portion of the channel has been increased to two hundred feet at the same depth.
About the Publisher
Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com
This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.